French Guiana, the Caribbean, Brazil

Drone imaging and engineering

Structural inspection, thermography, LiDAR surveys and construction monitoring for industry, energy, construction and public bodies, since 2015.

Request a quote
LiDAR under the canopyThe fleet’s new LiDAR, French Guiana, 2026

Reliable drone data, delivered in your formats

Sentinel plans, flies and processes drone missions for technical teams who need to measure, inspect or document a site.

Our pilots work in French Guiana, Martinique, Guadeloupe and Brazil, including on sensitive or hard-to-reach sites: Amazon rainforest, hydraulic structures, the launch areas of the Guiana Space Centre. We handle flight permits, data capture, processing and analysis, all the way to the final deliverable.

About Sentinel
2 000+missions since 2015 in French Guiana, the Caribbean and Brazil
30+launch campaigns at the Guiana Space Centre
3Offices: Kourou, Trois-Îlets and Rio de Janeiro
0,5mmper pixel: resolution achieved on structural inspections

Latest missions

The full log is updated every month.

  1. Site monitoringFrench Guiana

    Time-lapse and filming at the Sainte-Anne hybrid plant

    Mana, Sainte-Anne · Voltalia

    Time-lapse unit installed for the duration of the hybrid plant construction, first series of shots on 7 October 2026, after footage of the site in October 2025.

  2. InspectionBrazil

    Second mission at the Juquiá complex: faces of Serraria

    Serraria, São Paulo

    From 5 to 8 October 2026: upstream face of Serraria on the 6th in the rain, with nine flight plans, downstream face on the 7th with seventeen flight plans; on the 8th the automatic spillway gates were open and the downstream face under water, so the upstream face was flown again and the mission stopped. The rest of the campaign is postponed to the 2027 dry season; the three Salto do Iporanga orthophotos have been produced.

    Read the article
  3. Film, photo and 360°French Guiana

    Photo coverage of a water tower and a drinking-water intake

    Montsinéry-Tonnégrande, Roura · CACL

    On 12 October 2026, the water tower under construction in Montsinéry-Tonnégrande; on the 15th, the Comté intake in Roura: pumping station, floating intake and surroundings. Photos delivered the same day each time, as JPG and RAW.

  4. InspectionFrench Guiana

    Photogrammetric inspection of launch complex structures

    Guiana Space Centre · Inspection body

  5. LiDAR and photogrammetryFrench Guiana

    2026 orthophoto campaign: eight sectors and 6,545 hectares

    Matoury, Cayenne, Kourou, Saint-Laurent-du-Maroni, Macouria · EPFA Guyane

    Eight perimeters and 6,545 hectares in Cayenne, Kourou, Macouria, Matoury and Saint-Laurent-du-Maroni, ordered on 2 October 2026, with 10 cm orthophotos required by the specifications. First sector delivered, Sud-Bourg in Matoury (147 ha): four flights on 16 October, 1,909 photos at 3.88 cm per pixel, 3.7 cm planimetric error on five independent check points, orthophotos and reports delivered on 19 October.

    • 6 545 ha
    • 8 sectors
    • 3,7 cm check-point error
  6. LiDAR and photogrammetryFrench Guiana

    LiDAR inventory of the emerged stems of the Petit-Saut reservoir: 4,049 dead trees located and measured on a 46 ha test block

    Petit-Saut

    On 22 October 2026, five LiDAR flights and two photo flights from a small island, for a timber company working on the reservoir: height above water of every stem, base diameter for 88 % of them; GIS layers, point clouds and a web inventory page delivered.

    • 4 049 stems
    • 46 ha in one day
Ariane 6 launch complex (ELA4) construction, Kourou

At the Guiana Space Centre

Among the first drone operators deployed at Europe’s spaceport, we have been working there since 2016 for CNES and the companies on site: more than 30 launch campaigns, construction monitoring, inspections, surveys and virtual tours.

  • 2018–2021Aerial campaigns on the Ariane 6 launch complex construction: fourteen films published by the Guiana Space Centre
  • 2019Our photos of the Ariane 6 site published by ESA, Espace & Exploration and France-Guyane
  • 2019Inspection of 250 power network pylons
  • 2019Continuous topographic survey of more than 17 km of road for transferring Ariane 6 boosters
  • 202095 buildings inspected in six days
  • 2023Virtual tour of the Ariane 6 launch complex: 200 360° panoramas for CNES
  • 2023–2025LiDAR and photogrammetry of the three Salvation Islands
  • 2023–2025ELA4 flame trenches: post-launch inspections and a digital twin at 1.5 mm per pixel
  • 2024–2025Jet guide and deflector inspected after the first four Ariane 6 launches
  • 2026680 hectares of photogrammetry around the sounding rocket launch complex
  • 2026Long-term time-lapses on a launch construction site
Ten years at the Space Centre

How a mission works

A single point of contact from the first call to delivery, across all three territories.

  1. 01

    Planning

    Needs analysis, choice of sensor and resolution, flight plan, permits and coordination with air traffic services, including in the restricted areas of the Guiana Space Centre.

  2. 02

    Data capture

    Automated flights following the geometry of the site or structure, RTK positioning and ground control points when accuracy requires it.

  3. 03

    Processing

    Photogrammetry, LiDAR classification, radiometric mosaicking, defect detection and measurement.

  4. 04

    Delivery

    Plans, reports and data in your formats (GeoTIFF, LAS, DWG, PDF), also viewable online in Sentinel Cloud.

Sentinel Cloud

Our web platform brings together the data and analyses from your missions: orthophotos, 3D models, thermal surveys, located defects, measurements and reports. Your teams access it from a web browser.

  • Solar plant thermography
  • Surveying and measurements
  • Infrastructure inspection
  • 3D structural diagnostics
  • Virtual tours

Discover Sentinel Cloud

Thermal analysis of a solar plant in Sentinel Cloud: split infrared and visible view

Where we work

In French Guiana, the Caribbean and Brazil we follow the same procedures, from the permit request to delivery on Sentinel Cloud.

Clients

Space agencies, industrial groups, energy producers, construction companies, government services and local authorities.

  • CNES
  • ESA
  • Arianespace
  • ArianeGroup
  • Europropulsion
  • Groupe ADF
  • Eiffage
  • Eiffage Génie Civil
  • Eiffage Route
  • VINCI Energies (Omexom)
  • Voltalia
  • Systeko
  • TDF
  • EPFA Guyane
  • BRGM
  • ONF
  • Conservatoire du littoral
  • WWF

Also: Cemig, Furnas, Albioma, Genergies, Urbasolar, Akuo Energy, Omexom, Freyssinet, Triton, Edeis, Collectivité territoriale de Guyane, CACL, CCOG, DGTM Guyane, DEAL Martinique, Guyane La 1ère.

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, 735 – Pavimento 10
Centro, 20030-041 Rio de Janeiro – RJ
Brazil