Space Centre power network: 250 pylons inspected
In August 2019, inspection of 250 pylons of the base’s power network, so that our client could assess them and plan maintenance; the line supports were reviewed again until 2023.

Background
The power network supplies the base’s facilities, from the launch complexes to the technical buildings. Our client wanted to assess these supports and plan the necessary maintenance work.
What we did
In one week in August 2019 we photographed the 250 pylons up close, insulators and fittings included. Our client was able to assess them and plan the maintenance work. The line supports were then covered by new campaigns, the last one in 2023.
Other projects

The Ariane 6 launch complex construction, filmed and photographed from 2018 to 2021
From 2018 to 2021, aerial photo and video campaigns on the ELA4 construction site: fourteen films published by the Guiana Space Centre, photos used by ESA, Espace & Exploration and Latitude 5.

Launch campaigns: fifteen launches covered in Kourou from 2017 to 2019
Aerial photography of the launch complexes during Ariane 5, Soyuz and Vega campaigns, within the windows authorised by the base: fifteen launches from December 2017 to December 2019.

Flame trenches of the Ariane 6 launch complex: inspections and a digital twin at 1.5 mm per pixel
Since November 2023 we have photographed the inside of the two flame trenches of the ELA4, which carry the engine exhaust away at lift-off. In 2025 a photogrammetric survey turned them into a digital twin and eight orthophotos at about 1.5 mm per pixel.
Tell us about your project
Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.
97310 Kourou
French Guiana
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
20030-041 Rio de Janeiro – RJ
Brazil