São Francisco river, Bahia, Brazil · 2025

Hydroelectric plant on the São Francisco river: 2,492 anomalies mapped in three days on site

Baseline survey of a hydroelectric plant on the São Francisco river, in the state of Bahia: 11,809 photos in 33 flights, 9 orthophotos totalling 46 gigapixels, two 3D models, a virtual tour and a web interface for the operator’s engineers.

Hydroelectric plant on the São Francisco river: 2,492 anomalies mapped in three days on site
São Francisco river, Bahia, Brazil
11 809photos in 33 flights
2 492anomalies mapped, including 2,432 cracks
46gigapixels of orthophotos
0,85 mmper pixel on the downstream face of the powerhouse
2,65 kmof cracks measured

Background

The plant stands on the São Francisco river, in the state of Bahia. Its dam is of mixed design, combining concrete and rockfill. The engineering firm holding the operator’s contract entrusted us with the photogrammetric acquisition and processing: a baseline of the powerhouse, spillway, water intake and crest, to be compared in future inspections.

What we did

From 21 to 24 January 2025, after the site safety induction, two people worked with a single compact RTK drone, corrected by a permanent station of the IBGE geodetic network 3 km away. On the first day, general flights at 50 m with terrain following produced the 3D models that same evening, on which the close-range flights were computed; the drone then flew along the faces less than 4 m away, targeting 1 mm per pixel, and surveyed the galleries in 360° on the last day: 11,809 photos, 33 flights, more than 11 hours of flight, 66.5 km flown. Ten days of processing produced 9 orthophotos, from 0.85 to 3.08 mm per pixel on the faces and 8 mm on the crest, two 3D models, two modelled spillway trunnion beams and a 10-panorama virtual tour. Anomalies are classified into six types and named by zone, type and number: 2,492 in total, including 2,432 cracks totalling 2.65 km, 1,765 on the powerhouse, 581 on the spillway and 145 on the crest. The report was delivered on 18 February 2025 with a web interface, and the operator filed it in its project document system.

2 related missions in the log

  1. Sentinel CloudBrazil

    First web interface delivered for a dam inspection

    Rio São Francisco, Bahia

    On 18 February 2025, with the plant report: the 9 orthophotos with their anomalies positioned, 4 3D models (powerhouse, spillway, two trunnion beams) and the virtual tour, available online for one year; a video tutorial was added after the technical meeting on 21 February.

    • 9 orthophotos online
    • 4 3D models
    Read the article
  2. InspectionBrazil

    Drone inspection of a hydroelectric plant on the São Francisco river

    Rio São Francisco, Bahia

    From 21 to 24 January 2025, after the site safety induction: 11,809 photos in 33 flights and 66.5 km flown, including close-range flights less than 4 m from the faces; 9 orthophotos (46 gigapixels), two 3D models, a virtual tour and 2,492 mapped anomalies, delivered with a web interface.

    • 11 809 photos
    • 2 492 anomalies mapped
    Read the article

All missions

Gallery

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil