Centre Littoral urban community: the bus rapid transit works, the arrival of the buses and two drinking-water structures
In April 2024, ten sectors of the bus rapid transit works; in January 2026, the unloading of the buses at the port of Dégrad-des-Cannes; in October 2026, the Montsinéry-Tonnégrande water tower and the Comté water intake.

Background
The Centre Littoral urban community is building a bus rapid transit system, served by high-level-of-service buses, and new drinking-water structures. It entrusts us with aerial photography to document these projects as they progress.
What we did
In April 2024 we photographed ten sectors of the bus rapid transit works, from the Maringouins maintenance and depot centre and its interchange to boulevard Mandela and the République sector of line B; the images were delivered sorted by sector, then edited into a film in August. On 20 January 2026, the unloading of the Yanéo network buses was filmed at the Dégrad-des-Cannes port terminal, followed by their transfer to the maintenance centre: flights coordinated with the harbour master’s office, the prefecture and the civil aviation authority, terminal access declared in advance. In October 2026, two drinking-water structures: the Montsinéry-Tonnégrande water tower under construction on the 12th, then the Comté river intake, in Roura, on the 15th: pumping station, floating intake and surroundings, with photos delivered the same day each time, in JPG and RAW.
3 related missions in the log
Photo coverage of a water tower and a drinking-water intake
On 12 October 2026, the water tower under construction in Montsinéry-Tonnégrande; on the 15th, the Comté intake in Roura: pumping station, floating intake and surroundings. Photos delivered the same day each time, as JPG and RAW.
Unloading of the bus rapid transit vehicles filmed at the port of Dégrad-des-Cannes
On 20 January 2026, for the urban community’s communication department: unloading of the Yanéo network buses at the port terminal, then their transfer to the Maringouins maintenance and depot centre; flights coordinated with the harbour master’s office, the prefecture and the civil aviation authority.
Photo report and film of the bus rapid transit works on ten sectors
Aerial photography in April 2024 of the bus rapid transit works, from the Maringouins sector to boulevard Mandela and place de la République; photos sorted by sector in early May, video edit finalised in August 2024.
Other projects

12,647 hectares of orthophotos at 3.5 cm for EPFA Guyane
From 4 December 2023 to 1 March 2024, eight sectors photographed at 3.5 cm per pixel, from Cayenne to Cacao: 343 flights, 184,464 photos, 50 ground control points and 26 check points. A second 6,545-hectare campaign began on 16 October 2026; its first sector was delivered on 19 October.

Corossony solar plant: 1,472 concrete footings surveyed at 2 mm per pixel before repowering
A 1:500 topographic plan of the plant in operation in September 2024, then the position and height of each of the 1,472 footings kept for the new structures, in December 2025.

Waste in western French Guiana: eight visits in Saint-Laurent, four Maroni villages at 1 cm
Since October 2024, photos taken from the same viewpoints at every visit to the Saint-Laurent-du-Maroni waste storage facility, with a 3 cm orthophoto and a plan since December 2024; in February 2026, the waste sites of four river villages surveyed at 1 cm.
Tell us about your project
Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.
97310 Kourou
French Guiana
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
20030-041 Rio de Janeiro – RJ
Brazil