Juquiá river basin, São Paulo State, Brazil

Juquiá hydroelectric complex

The Juquiá complex, in the south of São Paulo State, brings together seven hydroelectric plants belonging to an energy producer: six dams in cascade on the Juquiá-Guaçu river, França, Fumaça, Barra, Porto Raso, Alecrim and Serraria, and Salto do Iporanga on the Assungui river, with crests of 140 to 265 m and heights of 15 to 45 m. The contract signed in July 2026 covers the detailed survey of the faces and crests of all seven structures, then a follow-up survey. From 17 to 21 August we flew over the seven dams and surveyed Salto do Iporanga in detail; from 5 to 8 October, the faces of Serraria, until the opening of the spillway gates interrupted the mission. The rest is scheduled for the 2027 dry season.

Juquiá hydroelectric complex
Juquiá river basin, São Paulo State, Brazil

Key facts

StructuresSix dams on the Juquiá-Guaçu river (França, Fumaça, Barra, Porto Raso, Alecrim, Serraria) and Salto do Iporanga on the Assungui river
DimensionsCrests from 140 to 265 m, heights from 15 to 45 m
CapacityFrom 24 MW (Serraria) to 72 MW (Alecrim) per plant
ContractSigned in July 2026: detailed survey of the upstream and downstream faces and crests, anomaly mapping, 3D models, web tool, then a follow-up survey
Missions17–21 August 2026: seven dams in general views, Salto do Iporanga in detail; 5–8 October 2026: Serraria
MethodGNSS base on the crest benchmarks set during the operator’s 2021 surveys, close automatic flights and manual complements
Missions listed3

On the map

Inspection

3 missions at this location

  1. InspectionBrazil

    Second mission at the Juquiá complex: faces of Serraria

    Serraria, São Paulo

    From 5 to 8 October 2026: upstream face of Serraria on the 6th in the rain, with nine flight plans, downstream face on the 7th with seventeen flight plans; on the 8th the automatic spillway gates were open and the downstream face under water, so the upstream face was flown again and the mission stopped. The rest of the campaign is postponed to the 2027 dry season; the three Salto do Iporanga orthophotos have been produced.

    Read the article
  2. InspectionBrazil

    First mission on the seven dams of the Juquiá complex

    Salto do Iporanga, Juquiá, São Paulo

    From 17 to 21 August 2026: general aerial views of the seven plants, França, Fumaça, Barra and Porto Raso on the 17th, Salto do Iporanga on the 18th, Serraria on the 19th, Alecrim on the 20th, and detailed acquisition of Salto do Iporanga, upstream face on the 19th and downstream face on the 21st, GNSS base on the operator’s crest benchmarks; reconnaissance report delivered on 1 September.

    • 7 dams visited
    Read the article
    First mission on the seven dams of the Juquiá complex
  3. InspectionBrazil

    Two-year contract for the seven dams of the Juquiá complex

    Juquiá, São Paulo

    Technical proposal validated in April, contract signed in July 2026: detailed survey of the faces and crests of seven dams with crests of 140 to 265 m, six on the Juquiá-Guaçu river and Salto do Iporanga on the Assungui river, anomaly mapping, 3D models and web tool, then a follow-up survey.

    Read the article
    Two-year contract for the seven dams of the Juquiá complex

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil