Savane des Pères solar plant: from bare ground to commissioning
Reconnaissance, mapping before earthworks, then a time-lapse throughout the assembly of a 3.8 MW plant with battery storage.

Background
The Savane des Pères plant combines 3.8 MW of panels with 2.6 MW / 2.9 MWh battery storage, which feeds electricity into the grid at the evening peak. Its builder wanted to document each phase of the works.
What we did
Aerial reconnaissance photos of the land, high-resolution georeferenced mapping before earthworks began, then a time-lapse throughout assembly. The plant was commissioned in October 2019.
Other projects

12,647 hectares of orthophotos at 3.5 cm for EPFA Guyane
From 4 December 2023 to 1 March 2024, eight sectors photographed at 3.5 cm per pixel, from Cayenne to Cacao: 343 flights, 184,464 photos, 50 ground control points and 26 check points. A second 6,545-hectare campaign began on 16 October 2026; its first sector was delivered on 19 October.

Corossony solar plant: 1,472 concrete footings surveyed at 2 mm per pixel before repowering
A 1:500 topographic plan of the plant in operation in September 2024, then the position and height of each of the 1,472 footings kept for the new structures, in December 2025.

Waste in western French Guiana: eight visits in Saint-Laurent, four Maroni villages at 1 cm
Since October 2024, photos taken from the same viewpoints at every visit to the Saint-Laurent-du-Maroni waste storage facility, with a 3 cm orthophoto and a plan since December 2024; in February 2026, the waste sites of four river villages surveyed at 1 cm.
Tell us about your project
Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.
97310 Kourou
French Guiana
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
20030-041 Rio de Janeiro – RJ
Brazil