  3. Savane des Pères solar plant: from bare ground to commissioning
Voltalia · Savane des Pères, Sinnamary, French Guiana · 2019

Savane des Pères solar plant: from bare ground to commissioning

Reconnaissance, mapping before earthworks, then a time-lapse throughout the assembly of a 3.8 MW plant with battery storage.

Savane des Pères solar plant: from bare ground to commissioning
Savane des Pères, Sinnamary, French Guiana
3,8 MWof panels
2,9 MWhof storage
3phases documented

Background

The Savane des Pères plant combines 3.8 MW of panels with 2.6 MW / 2.9 MWh battery storage, which feeds electricity into the grid at the evening peak. Its builder wanted to document each phase of the works.

What we did

Aerial reconnaissance photos of the land, high-resolution georeferenced mapping before earthworks began, then a time-lapse throughout assembly. The plant was commissioned in October 2019.

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil