Larivot bridge: the repair of a 1,225 m bridge, filmed over eight visits
Since October 2024, aerial and ground photos and videos at each phase of the repair works on the existing bridge, and in March 2026 a four-to-five-minute film for the contractor’s convention.

Background
The Larivot bridge carries national road 1 over the Cayenne river, between Cayenne and Macouria: 1,225 m and 35 spans, built between 1974 and 1976. On behalf of the DGTM, Freyssinet is carrying out its repair and maintenance, from the steel piles to the concrete of the pier caps and deck, while the new bridge is being built alongside. The contractor wanted footage of every phase, on the ground and from the air, for its communication and for an end-of-works film.
What we did
After a scoping meeting in April 2024, we agreed with the works manager on the list of phases to film and on eleven visits, with interviews of the teams. The bridge lies within the control zone of Cayenne airport: each campaign requires clearance from air traffic control or the prefecture, and the dates follow the works schedule. Eight visits took place between 8 October 2024 and 23 July 2026: dredging, installation of the travelling gantries under the beams and a new jetty in February 2025, anodes fitted by divers and work from rolling and floating platforms in July 2025, divers again in November. On 24 February and 3 and 4 March 2026 we shot the sequences of a four-to-five-minute film for the company’s convention: interviews, pre-shift briefing, crews heading to the site by boat, access to the platforms. It was delivered in two versions, on 13 and 20 March. Freyssinet had already entrusted us with the film of the Sinnamary bridge works, delivered in February 2023 and in its final version in February 2024.
7 related missions in the log
Eighth visit to the Larivot bridge works
On 23 July 2026; the ninth of the eleven visits ordered is scheduled for 29 October 2026, and the following ones will be used for the interviews of the end-of-works film.
Read the articleConvention film of the Larivot bridge works
Filming on 24 February and 3 and 4 March 2026: interviews, pre-shift briefing, safety talk, crews heading to the site by boat; four-to-five-minute film delivered in two versions, on 13 and 20 March, for the company’s convention.
Read the articleDivers filmed on the Larivot bridge works
Fourth visit, on 26 November 2025, postponed from October to film the divers at work; photos delivered the next day.
Read the articleDivers and platforms on the Larivot bridge works
Third visit, on 2 July 2025: anodes fitted by divers and work from the rolling and floating platforms.
Read the articleDredging and travelling gantries filmed on the Larivot bridge
Second of eleven visits, on 20 February 2025, once the dredging machine was back: dredging, installation of the travelling gantries under the beams and a new jetty at the port; photos delivered the next day.
Read the articleFirst visit to the Larivot bridge repair works
On 8 October 2024, first of the eleven visits ordered by the company repairing the bridge: video rushes for the edit. Flights inside the Cayenne airport control zone, with air traffic control approval for the week of 7 to 11 October and a call to the tower before and after the mission.
Read the article
Other projects

12,647 hectares of orthophotos at 3.5 cm for EPFA Guyane
From 4 December 2023 to 1 March 2024, eight sectors photographed at 3.5 cm per pixel, from Cayenne to Cacao: 343 flights, 184,464 photos, 50 ground control points and 26 check points. A second 6,545-hectare campaign began on 16 October 2026; its first sector was delivered on 19 October.

Corossony solar plant: 1,472 concrete footings surveyed at 2 mm per pixel before repowering
A 1:500 topographic plan of the plant in operation in September 2024, then the position and height of each of the 1,472 footings kept for the new structures, in December 2025.

Waste in western French Guiana: eight visits in Saint-Laurent, four Maroni villages at 1 cm
Since October 2024, photos taken from the same viewpoints at every visit to the Saint-Laurent-du-Maroni waste storage facility, with a 3 cm orthophoto and a plan since December 2024; in February 2026, the waste sites of four river villages surveyed at 1 cm.
Tell us about your project
Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.
97310 Kourou
French Guiana
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
20030-041 Rio de Janeiro – RJ
Brazil