1. Home
  2. Guadeloupe
  3. Le Moule
Grande-Terre, Guadeloupe

Le Moule

In Le Moule, the Creuilly photovoltaic plant has been monitored by thermography since 2022: campaigns on 22 October 2022, 19 December 2024 and 6 November 2025, all flown by our partner Antilles Drone and analysed by Sentinel. In August 2026, five of the eight ground-mounted plants diagnosed for Genergies in Guadeloupe were in the municipality: 12,129 panels checked in infrared and visible light by our Martinique team.

Key facts

CreuillyThermal surveys on 22 October 2022, 19 December 2024 and 6 November 2025, flights by Antilles Drone, analysis by Sentinel
Genergies, August 2026Five ground-mounted plants in the municipality, 12,129 panels
Missions listed4

On the map

InspectionThermography

4 missions at this location

  1. ThermographyGuadeloupe

    Diagnosis of eight ground-mounted photovoltaic plants in Guadeloupe

    Le Moule, Petit-Canal, Saint-François, Gourbeyre · Genergies

    Eight ground-mounted plants exporting all their output, flown from 3 to 5 August 2026 with additional flights on the 13th: 18,671 panels in infrared at 3 cm and visible at 1 cm, under 1,000 to 1,267 W/m²; a detailed report, a summary and a plan per plant, approved on 19 August.

    • 18 671 panels
    • 8 plants
    Read the article
    Diagnosis of eight ground-mounted photovoltaic plants in Guadeloupe
  2. ThermographyGuadeloupe

    Thermal survey of a photovoltaic plant in Le Moule

    Le Moule · Akuo Energy

    Ready-to-fly thermal missions sent to Antilles Drone on 3 November (34 m, 3 cm per pixel, visible at 1.92 cm), flights on the 5th under 906 W/m², report on the 7th: 7,704 modules checked and compared with the 2022 campaign.

    • 7 704 modules
    • 3 cm per pixel in infrared
    Read the article
  3. InspectionGuadeloupe

    Two roof inspections for photovoltaic projects

    Baie-Mahault, Le Moule · So Watt

    Flights on 19 May 2025, deliverables handed over on the 26th.

  4. ThermographyGuadeloupe

    Second thermal survey of the Creuilly photovoltaic plant in Le Moule

    Le Moule · SECP Creuilly

    Flights carried out on 19 December 2024 by our partner Antilles Drone, processing by Sentinel. The plant had first been inspected in October 2022; a third campaign followed in November 2025.

    Read the article

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil