A 90 kV line at Matiti: 511 photos and 106 anomalies on five wooden supports

Inspection and thermography

On 1 June 2026, in the late afternoon, Omexom THT Antilles-Guyane asked us for a drone inspection of a 90 kV line in Macouria, between supports 50 and 60. A fault was preventing the line from being re-energised, and they needed to see what had happened: a cable on the ground, a snake on a conductor, a pylon down. The quote was approved within the hour, with a meeting point in Macouria the next day between 6.30 and 7 am.

A fault check the next morning

On 2 June our team photographed supports 50 to 60, then supports 66 and 94. Two defects were spotted on the cables of the 94–95 span: their position was recorded and delivered in KML and GeoJSON, with an image showing their distance from the support and the photos sorted by support. The results went out in the late afternoon, less than twenty-five hours after the request.

Five wooden supports, on 3 June

During the fault check, Omexom gave us a second job on the same line: the assessment of five wooden-pole supports at Matiti, between supports 43 and 47, namely two pylons and three portal frames. The mission was set for the following day. Each support was photographed in detail according to the client’s specification: 511 photos, each with its GPS position and the heading of the shot.

5wooden supports
511photos
106anomalies recorded
2high-severity anomalies

106 anomalies, rated on four levels

The photos were loaded into the Sentinel Cloud pylon inspection module, where each anomaly is boxed on the image, typed and rated on four severity levels: low, medium, high, critical. The result: 106 anomalies, all open at delivery. By type, 30 are corrosion, 30 bird nesting, 14 structural cracks and 5 loose or missing bolts; the other 26 are mostly termites in the wood. By severity: 7 low, 97 medium, 2 high and none critical. The two high-severity anomalies are corrosion on the access portal and a structural crack on portal 2.

  • Access portal: 22 anomalies
  • Portal 2: 18 anomalies
  • Portal 3: 23 anomalies
  • Pylon 45: 19 anomalies
  • Pylon 46: 24 anomalies
The Sentinel Cloud inspection viewer, shown here on a medium-voltage support inspected in 2024: oriented photo, position, adding an anomaly
The Sentinel Cloud inspection viewer, shown here on a medium-voltage support inspected in 2024: oriented photo, position, adding an anomaly

What was delivered

On 5 June Omexom received all the photos, the annotated photos, a 109-page PDF inspection report with one sheet per anomaly (photo, type, severity, GPS position, orientation) and the Excel table of defects. Its teams were also given access to the platform, where each anomaly can be closed, with a date and a comment, once it has been dealt with.

The same day in Guadeloupe

Also on 2 June, our partner Antilles Drone was photographing pylons 36 to 38 of the 63 kV Bouillante – Sainte-Rose line for the same client, inside the Guadeloupe national park: pylon 37 was fully covered that day, and pylon 36 was completed on 15 July.

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil