  3. BHNS works at Balata: two time-lapse cameras for fourteen months
Ribal TP · RN2, from Balata to the PROGT roundabout, Matoury · 2024–2025

BHNS works at Balata: two time-lapse cameras for fourteen months

From 8 November 2024 to 31 December 2025, two time-lapse units and five days of aerial and ground filming on the RN2 upgrade in Matoury, for the civil works contractor.

BHNS works at Balata: two time-lapse cameras for fourteen months
A self-contained time-lapse unit, here on another site in French Guiana
14months of time-lapse
2time-lapse cameras
5days of aerial and ground filming
2video edits

Background

In Matoury, national road 2 is being rebuilt between the Balata junction and the PROGT roundabout to carry the bus rapid transit line: the project provides two traffic lanes and one bus lane in each direction, plus paths for pedestrians and cyclists. Ribal TP, which is carrying out the works for the DGTM, wanted regular images of the site for its communication, over works planned to last three years.

What we did

We installed two autonomous time-lapse units on fixed viewpoints over the site, the first on 8 November 2024 and the second on 16 December 2024, then handled their programming as the works progressed, their maintenance and the retrieval of the images. Five days of aerial and ground filming completed this continuous record: 16 July and 18 October 2024, 9 January, 27 March and 19 June 2025. A first edit covering the early months was delivered in 4K in June 2025, and a second one of about a minute and a half, tracing the works up to the June shoot, on 29 October 2025. The time-lapses were delivered by period, November 2024 to June 2025, July to September and October to December 2025, and as a fourteen-month cumulative version on 9 January 2026. The contract ended in late 2025, after which the units were removed.

In the mission log

  1. Site monitoringFrench Guiana

    Fourteen months of time-lapse on the Balata bus rapid transit works

    Balata, Matoury (RN2) · Ribal TP

    Upgrade of the RN2 between Balata and the PROGT roundabout: five days of aerial and ground filming from July 2024 to June 2025, two time-lapse cameras from 8 November 2024 to 31 December 2025, two edits delivered in June and October 2025, cumulative time-lapse delivered on 9 January 2026.

    • 14 months of time-lapse
    • 2 cameras
    • 5 filming days
    Read the article

All missions

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil