1. Home
  2. Sentinel Cloud
  3. Power networks

Sentinel Cloud for power networks

The pylon inspection module presents a line structure by structure: the photos of each pylon, oriented and positioned, the anomalies found with their level, and the lines drawn on the map. Operations teams prepare their work without going back on site.

Sentinel Cloud for power networks
63 kV line structure, Guadeloupe

What the pylon inspection module does

Pylon-by-pylon visit

Each structure has its record: position, photos of the head, cross-arms, insulators, legs and joints, taken at a known heading and height.

Annotated anomalies

Twelve anomaly types, including corrosion, nesting, structural cracks, bolting, insulators and vegetation: each anomaly is boxed on the photo, rated on four severity levels and tracked until it is closed.

Lines on the map

Inspected structures and line sections appear on the project map as soon as you zoom in.

Downloadable photos

The photos of one pylon or of the whole visit can be downloaded as an archive for your maintenance files.

Inspection report

PDF report with the list of anomalies per structure, their level and the corresponding photos, in addition to online access.

One inspection, in figures

Five wooden-pole supports of a 90 kV line at Matiti (Macouria, French Guiana), inspected on 3 June 2026 for Omexom.

Photos511
Anomalies found106
By type30 corrosion, 30 nesting, 14 structural cracks, 5 bolting, 26 other (mostly termites)
By level7 low, 97 medium, 2 high, 0 critical

On the platform and in the field

Medium-voltage lines in French Guiana (2024 inspection, Sinnamary lot online since March 2026) and the 63 kV Bouillante–Sainte-Rose line in Guadeloupe (June and July 2026, with Antilles Drone).

Our experience of power lines

In 2024 our teams photographed 1,262 supports along 128 km of medium-voltage lines in French Guiana, in 19 flying days and up to 99 supports a day. In 2019, 2020, 2021 and 2023 we also inspected the power-line supports of the Guiana Space Centre.

  • Medium-voltage, 63 kV and 90 kV lines, in forest and savanna
  • Doubt-removal visits after a fault
  • Detailed part-by-part inspection: 178 photos for one 63 kV pylon, 511 for five wooden supports

Frequently asked questions

Does the line need to be switched off?

Not for an inspection: in 2024, on the medium-voltage lines of French Guiana, the drone stayed more than 3 m from each conductor and the flight schedule was sent to the operator’s control engineer. During the June 2026 fault check, the line was already out of service because of the fault.

How do you find an anomaly in the field?

Each photo carries the drone’s position, heading and height; the pylon record indicates the part concerned.

See the platform with your data

Send us a dataset or describe your site: we will open a demo access for you.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil