We have worked on the spaceport since 2016: launch campaigns, monitoring of the construction of the Ariane 6 launch complex, structural inspections, topographic surveys and virtual tours. Flights there require authorisation, and we stay discreet about recent missions.

Guiana Space Centre
Kourou, French Guiana

Key facts

Since2016
Launch campaigns30+
Ariane 6 siteMonthly monitoring 2018–2021, 200-panorama virtual tour in 2023
Missions listed16

On the map

InspectionThermographyLiDAR and photogrammetrySite monitoring

16 missions at this location

  1. InspectionFrench Guiana

    Photogrammetric inspection of launch complex structures

    Guiana Space Centre · Inspection body

  2. LiDAR and photogrammetryFrench Guiana

    Photogrammetric survey of 680 hectares around the sounding rocket launch complex

    Guiana Space Centre · CNES

    On 15 and 16 April 2026: 25,928 oblique and vertical images at 120 m, a 667-million-point cloud, a 274-million-face mesh, a 3.48 cm orthophoto and contour lines, for a low-level wind simulation.

    • 680 ha
    • 25 928 images
  3. Site monitoringFrench Guiana

    Four long-term time-lapses on a launch-site construction project

    Guiana Space Centre · Construction consortium

    Cameras installed for three months on viewpoints agreed with the client, monthly photo monitoring of the site.

  4. InspectionFrench Guiana

    Jet guide and deflector inspected after the fourth Ariane 6 launch

    Guiana Space Centre · Groupe ADF

    The same imagery after the November 2025 flight: jet guide outside and inside, then the deflector.

  5. ThermographyFrench Guiana

    Hydrogen burn pond igniters checked at every launch preparation

    Guiana Space Centre · Eiffage Énergie Systèmes

    Seven thermal camera visits between February 2025 and April 2026, at each phase of Ariane 6 launch preparations on the ELA4.

  6. InspectionFrench Guiana

    ELA4 jet guide inspected after the third Ariane 6 launch

    Guiana Space Centre · Groupe ADF

    Outside and inside of the jet guide in 360° views, over its full height.

  7. InspectionFrench Guiana

    Inspection of the ELA4 deflector

    Guiana Space Centre · Groupe ADF

    Close-up photos of the deflector of the Ariane 6 launch complex.

  8. LiDAR and photogrammetryFrench Guiana

    Digital twin of the inside of the ELA4 flame trenches

    Guiana Space Centre · Groupe ADF

    Full photogrammetric survey of both flame trenches: digital twin, eight orthophotos at about 1.5 mm per pixel of the walls, floors and ceilings, and a web interface to measure and overlay surveys.

    • 8 orthophotos
    • 1,5 mm per pixel
  9. InspectionFrench Guiana

    ELA4 flame trench concrete walls compared with their November 2023 state

    Guiana Space Centre · Groupe ADF

    Photos of 7 May 2025 retaken position by position and compared with those of November 2023; the report of 15 May locates the deterioration that appeared on the walls of the east and west trenches.

  10. InspectionFrench Guiana

    ELA4 jet guide inspected after the second Ariane 6 launch

    Guiana Space Centre · Groupe ADF

    Outside of the jet guide and inside in 360° views over its full height; photos and mosaics viewable in a web interface.

  11. InspectionFrench Guiana

    Flame trenches, jet guide and deflector inspected after the first Ariane 6 launch

    Guiana Space Centre · CNES

    After the July 2024 maiden flight: concrete walls of the flame trenches, sprinkler nozzles, jet guide in 360° views over its full height and deflector, with mosaics viewable in a web interface.

  12. ThermographyFrench Guiana

    Hydrogen burn pond igniters checked before the first Ariane 6 launch

    Guiana Space Centre · CNES

    Two thermal camera visits, on 12 and 24 June 2024.

  13. ThermographyFrench Guiana

    Emergency drone support during a vegetation fire

    Guiana Space Centre

    Locating hotspots, infrared flights to detect residual heat and mapping of the burnt area over two days.

  14. LiDAR and photogrammetryFrench Guiana

    LiDAR and photogrammetry survey of three areas, including the former Diamant site

    Guiana Space Centre · Engineering firm

    Orthophotos from 3 to 50 cm resolution, 1 m contour lines (terrain and surface) and point clouds delivered in DWG.

  15. InspectionFrench Guiana

    First survey of the inside of the ELA4 flame trenches

    Guiana Space Centre · CNES

    Photos of the concrete walls on all four faces of both flame trenches, the sprinkler nozzles, the jet guide, outside and inside, and the deflector; this first inspection also set the limits of the equipment in these enclosed volumes.

  16. ThermographyFrench Guiana

    ELA4 hydrogen burn pond igniters checked during the Ariane 6 tests

    Guiana Space Centre · CNES

    Seven thermal camera visits between 23 June and 14 December 2023, during the Ariane 6 tests on its launch complex.

    • 7 visits

Tell us about your project

Location, area or structure, expected deliverables and timing: with these details we can propose a method and a quote.

French Guiana3 rue Gramme
97310 Kourou
French Guiana
MartiniqueDomaine de Château Gaillard
Route des Trois-Îlets
97229 Les Trois-Îlets
Martinique
BrazilRua Santa Luzia, Centro
20030-041 Rio de Janeiro – RJ
Brazil